Check out the future of the Mercer Corridor Project! It sounds like we have $30 million but ONLY need $130 million more…it all comes down to voters this fall.
Instead of resurfacing the road, it will be rebuilt into a two-way road with three lanes in each direction, parking, sidewalks and a median with left-turn lanes. Valley will be narrowed to a two-lane, two-way street.